Skip to content
For hill wind farm operators · First projects in 2028

Same ridge. Same connection. More MWh.

WindNext puts fixed rows of modular wind turbines along your ridge crest, in the clear space beneath your turbines' blades. Plan them into your repowering and get more energy from the land, roads and grid connection you already have. No new land, no new towers. Certified safe for birds. Zero infrasound.

  • 60-year design life
  • 100% recyclable steel and aluminium
  • Zero infrasound
  • Designed in Slovenia, built in Europe
Illustration: a ridge with tall repowered wind turbines and two WindNext rows along the crest beneath the blades
The problem

Your ridge is only half used.

Your hill farm sits on one of the best wind resources in Europe, and you have already paid for the hardest parts: the permit, the roads, the land agreements and the grid connection. Yet the turbines use only the upper part of the wind. The layer near the crest, below the blade tips, produces nothing.

Repowering makes the gap bigger. Many low turbines are replaced by fewer, taller ones, so the lower layer is cleared and left empty, while the grid connection you fought for may end up underused.

Meanwhile, new capacity is getting harder to add:

Ridge cross-section with a tall turbineThe 0 to 45 m layer above the crest, below the blade tips, is shaded and labelled unused wind layer.unused wind layer0–45 mTurbines use theupper part of the wind
The layer near the crest, below the blade tips, produces nothing.

New sites are scarce.

Good wind sites are rare, flat land is taken by homes and farming, and ever-larger turbines are harder to move up a hill.

Permits get tougher.

Communities object to infrasound and bird deaths. Wildlife conditions in new permits mean curtailment: German law requires operators to accept bird-protection curtailment of up to 8% of annual yield.3

Wildlife incidents cost real money.

ESI Energy (NextEra), US, 2022: $1.86M fine plus $6.21M restitution for eagle deaths at 50 facilities.1 Aumelas (EDF Renouvelables), France, 2025: €5M in fines (half suspended) and 31 turbines stopped for 4 months.2

Legacy turbines don't last.

About 20 years, then replacement, with fibreglass blades that are almost impossible to recycle.

Sources: 1 US Department of Justice 2022 · 2 franceinfo 2025 · 3 BNatSchG §45b

The solution and how it works

WindNext fills the lower layer of your wind farm.

WindNext is a modular multi-rotor wind turbine designed for hills. Instead of one giant rotor on a tall tower, it uses rows of small modular turbines fixed in place along the ridge crest, in two stacked rows. The rows reach about 43.7 m, so they fit in the clear space beneath the blades of large turbines.

Ridge elevation: a large repowered turbine with two WindNext rows below its bladesTwo rows of 17.4 m modular wind turbines, hubs at 18 m and 35 m, about 43.7 m total height, sit along the crest in the clear space beneath the blades of a large turbine. Detail A enlarges the two rows.RIDGE ELEVATIONUpper wind layerlarge repowered turbine+ Lower wind layertwo WindNext rows, ≈ 43.7 mADETAIL A · FRONT VIEW OF TWO ROWShub 18 mhub 35 m≈ 43.7 mØ 17.4 mRotors ≈ 135 kW each · rows follow the ridge line
Schematic; the large turbine is an example of a repowered machine. Hubs at 18 m and 35 m, top of rows at about 43.7 m, rotor 17.4 m.
  1. 1

    Two rows along the crest.

    Rotors of 17.4 m, about 135 kW each, with hubs at 18 m and 35 m. The rows follow the ridge line.

  2. 2

    Fixed, facing the ridge wind.

    The rows don't yaw. Cross-ridge wind is caught from both sides of the crest, so a single row works whichever way the prevailing wind blows across the ridge.

  3. 3

    Three effects, one module.

    The shroud is designed to enhance the jet effect. Rotors close together increase the yield of each one. Wind arriving at a ±30° angle increases yield by up to 35%.

  4. 4

    Built on site from small parts.

    95% of each module is made of only four parts: hoop modules, crossbar holders, shroud envelope parts and blades. The biggest segment is 1.5 × 11.3 × 2.2 m and weighs 2.3 tonnes, so it travels on smaller trucks and goes up with smaller cranes on your existing roads.

Cross-ridge sectionThe fixed WindNext row stands on the crest and takes wind arriving across the ridge from either side.CROSS-RIDGE SECTIONWind from one side……or the otherfixed row, no yaw
A fixed row takes cross-ridge wind from either side of the crest.
Shroud jet effectSide section through a WindNext rotor and its shroud. Wind arrives from the left. The streamlines that pass through the shroud move closer together at the rotor, which means faster air at the blades; the outer streamlines bend around the shroud.SHROUD SECTION, SIDE VIEWWindshroudstreamlines close up at the rotor: faster air
The shroud is designed to enhance the jet effect, so the air speeds up as it passes the rotor.
Built on site from four partsFour part types, hoop modules, crossbar holders, shroud envelope parts and blades, are assembled on site into one WindNext module standing on two legs, one on each side of the rotor. The largest segment is 1.5 by 11.3 by 2.2 metres and weighs 2.3 tonnes.BUILT ON SITE FROM FOUR PARTSHoop modulesCrossbar holdersShroud envelopeBladeson siteone module, rotor 17.4 mLargest segment 1.5 × 11.3 × 2.2 m, 2.3 t
95% of each module is made of four parts, assembled on site with smaller trucks and cranes.
Estimated yield per km of ridge by mean wind speedBar chart, estimated average case at 35 m hub height: about 11,600 MWh a year per km of ridge at 6 m/s, 16,500 at 7 m/s and 21,500 at 8 m/s.MWh A YEAR PER KM OF RIDGE0k5k10k15k20k25k11,6006 m/s16,5007 m/s21,5008 m/sMean wind speed at 35 m hub · Estimated, average case.
Estimated yield per km of ridge, average case, by mean wind speed at the 35 m hub.
Front view along the crestFront view of WindNext modules lined up along a ridge crest: a lower row with hubs at 18 m and an upper row with hubs at 35 m, rotors 17.4 m, top of the rows at about 43.7 m.18 m hub35 m hub43.7 mFRONT VIEW ALONG THE CREST
Front view: two rows of small modular turbines along a crest, hubs at 18 m and 35 m, top of the rows at about 43.7 m.
Repowering clears the lower 45 metres of your ridge. WindNext puts them to work.
Benefits for operators

What WindNext gives your wind farm.

+MWh

More MWh from the same site

Add 15,500 MWh a year per km of ridge (estimated, average case).

More energy within your existing grid connection

Many repowerings keep the same grid cap. WindNext adds MWh through the export capacity you already have, and where there is headroom there is no new grid application to wait for.

No new land, no new towers

The rows sit on the existing crest strip, below the blades, at about 43.7 m. No new tall structures on the skyline.

Fewer permitting fights

Low, fixed and visible. Certified safe for birds. Zero infrasound. Small foundations and less soil work help planning permission move faster.

Uses the roads you have

Small components, smaller trucks and cranes. No oversized blade transports up the hill.

A 60-year asset

Designed to last up to 60 years with scheduled maintenance, three times the life span of legacy turbines.

Built for the storm

Designed to withstand extreme winds over 300 km/h.

The repowering use case

Repowering is the moment to plan WindNext in.

When you repower, you rewrite the layout of your site anyway. Taller hubs and longer blades lift the rotors away from the crest and clear the lower layer. That is exactly where WindNext works.

Design both layers in one go: the big turbines above, WindNext rows below, in one layout, one permit process and one connection plan. You keep the roads, the land agreements and the grid connection, and you add MWh that the new layout would otherwise leave on the table.

1Your farm today
2Repowered
3Repowered + WindNext

65 GW

of Europe's wind fleet will be over 20 years old by 2030.

Source: WindEurope, 2026 (forecast).

The lower layer is freed.

An average new onshore turbine has a 146 m hub and a 151 m rotor, so its lowest blade tip sits at about 70 m. The layer from about 9 to 44 m above the crest stays empty, and that is where WindNext works: frame 2 shows the empty lower layer, frame 3 the WindNext rows in it, as in the ridge elevation under How it works. Where tip heights are capped, the gap is smaller, so every site starts with a clearance check.

Source: Deutsche WindGuard, average of 2025 installations; tip height derived.

From your site to a pilot, in three steps:

STEP 1

Clearance check.

We check geometrically that your existing or planned blades leave room for WindNext rows at the base of the farm.

STEP 2

Repowering fit.

We place WindNext rows into your repowering layout and check grid headroom and the lease of the crest strip.

STEP 3

Pilot-site study.

A study on one of your sites leads to a first WindNext installation. First projects in 2028.

Also works without repowering: where today's blades already leave enough clearance, WindNext rows can be added to an operating farm. One of our first pilot projects is an expansion of an existing wind farm.

Check my site
WindNext in numbers
17.4m
rotors, about 135 kW each
2rows
hubs at 18 m and 35 m, about 43.7 m total height
60years
design life, 3× legacy turbines
100%
recyclable steel and aluminium, blades included
>300km/h
extreme wind design
772
of 2,251 hill and ridge wind farms screened in the EU-27 and UK have the cross-ridge wind that suits WindNext rows*
Yield per km of ridge
~15,500MWh/yr

per km of ridge crest (typical range 4,000-26,000)

About 15 MW installed per km (about 115 rotors). Estimated, average case.

By mean wind at 35 m hub

Mean windMWh/year per km
6 m/sabout 11,600
7 m/sabout 16,500
8 m/sabout 21,500

* WindNext screening, Oct 2026, based on OpenStreetMap, Copernicus DEM, ERA5 and Global Wind Atlas data. Screening-level and indicative; every site needs its own check.

Is your wind farm one of them? See the indicative extra MWh for hill and ridge wind farms across Europe on our map. Per-farm figures are often lower: usable crest is usually a few hundred metres.

Find your wind farm
+300 GW onshore potential unlocked in Europe (legacy potential 220 GW)+60 GW in Spain (legacy 30 GW)Madrid region: 350 MW → 2,500 MWSource: WindNext analysis, windnext.energy.
Birds and noise

Safe for birds.
Quiet for neighbours.

Birds

Legacy rotors are nearly invisible and turn with the wind, so birds have no constant obstacle to learn. WindNext rows are fixed in place with an obvious shroud, a constant obstacle that birds see and avoid. WindNext turbines are certified safe for birds.

Certified safe for birds. Zero infrasound.
Side-by-side drawing. Left: a WindNext module, a small rotor inside a hexagonal frame on legs, where the visible frame outline covers the whole danger zone. Right: a legacy turbine, where only the thin blades and tower are visible inside a much larger circular danger zone. Birds fly around both.
Visual dimensions of a WindNext module vs a legacy rotor

Infrasound

In legacy turbines, high-speed blades pass a large tower and create strong pressure waves: infrasound that can cause chronic noise stress in neighbours. A 2026 full-scale test by DTU and NREL on a 1.5 MW turbine measured an impulsive load of 100–150 N/m on the tower each time a blade passed, and found that these pressure swings likely contribute to low-frequency noise. WindNext has no tower in front of or behind the blades. Its rotors turn at 12 to 60 RPM, so they cannot create sound below 20 Hz. Zero infrasound, by design.

Source: Madsen et al., Wind Energy Science 11, 3337–3357 (2026)

Legacy turbine: blades pass the towerFront view of a legacy turbine. Each time a blade passes in front of the tower, a pressure pulse spreads out, the source of infrasound.blade passesthe tower:pressure pulseLEGACY, WITH TOWER
WindNext: no tower behind the bladesFront view of a WindNext module. The rotor turns inside its shroud ring, which stands on two legs at its sides, so no tower stands behind the blades and no pressure pulse is created.nothing behindthe blades:no pulseWINDNEXT, NO TOWER
We believe that the WindNext modular turbine design lowers the risk of collisions with birds, as the frame represents a visual barrier enabling the larger birds to see the obstacles.
Birdlife society of Slovenia (DOPPS)

Why it matters to you

Wildlife and noise are where permits stall and where curtailment and fines come from. A low, fixed, visible turbine without infrasound gives your EIA team and the community a different conversation.

Monitoring commitment

Our pilots include bird monitoring with DOPPS (BirdLife Slovenia) and local BirdLife partners, plus acoustic and infrasound measurements, and we will publish the results.

Sustainability

Built once. Built for 60 years. Fully recyclable.

Galvanised steelAircraft-grade aluminiumFully recyclable

A legacy turbine is replaced after about 20 years, and its fibreglass blades usually end up in landfill or an incinerator. WindNext is designed to last up to 60 years with scheduled maintenance: one WindNext installation covers the life of three generations of legacy turbines.

All parts except the generator and electrical equipment are galvanised steel and aircraft-grade aluminium. The blades are fully recyclable too. At the end of its service life, the module goes back into the material cycle.

Small parts mean smaller foundations, less soil work and fewer heavy transports up the hill, so the build itself leaves a lighter footprint on the ridge.

Swipe to see the full timeline →

Over 60 years, three legacy turbines are replaced in sequence while one WindNext row runs the whole spanLegacy turbinesWindNextgeneration 1replacegeneration 2replacegeneration 3one installation · up to 60 years with scheduled maintenance0 years20 years40 years60 years
One WindNext installation covers the life of three generations of legacy turbines.
FAQ

Operator questions

Can't find your question? Contact us.

Will WindNext interfere with my existing turbines?

Every site gets a geometric clearance check first, so the rows stay in the clear space beneath your blades. The pilot measures wake and turbulence interaction with your existing rotors using lidar.

How much energy will it add?

It depends on your ridge, its wind and the length of crest available. Estimated, average case: about 15,500 MWh a year per km of ridge (typical range 4,000-26,000), with about 15 MW installed per km (about 115 rotors). By mean wind at 35 m hub: 6 m/s about 11,600, 7 m/s about 16,500, 8 m/s about 21,500 MWh/year per km. At existing farms the usable crest is often only a few hundred metres, so see the wind farm map for per-farm figures. Your site study gives an indicative yield range; the pilot verifies the power curve to IEC 61400-12-1.

The rows are fixed. What if the wind changes direction?

WindNext is designed for ridges where most of the wind blows across the crest. The rows take wind from both sides, and wind arriving at a ±30° angle increases yield by up to 35%. Our screening found 772 of 2,251 hill and ridge wind farms in the EU-27 and UK with this cross-ridge wind.

Will I need a new permit or EIA?

That depends on the country and on your existing permit. The best route is to design WindNext into your repowering permit. Smaller foundations and less soil work help planning permission move faster.

Can WindNext go into my repowering permit?

That is the plan. EU rules (RED III) cap the permit process for repowering at one year, or six months in renewables acceleration areas. WindNext is designed to go into the same permit application and environmental assessment as your new turbines, with no separate process. National rules still differ, so we check the route for your site in the site study.

Can I use my existing grid connection?

Yes, that is the idea: more MWh through the connection you already have. We check the headroom in the site study. Where the connection is full, WindNext can be paired with storage or curtailment scheduling.

Is it certified? Is it bankable?

Type certification is under way and the type certificate is planned for 2028, together with first deliveries. Pilots include independent power-curve measurement. WindNext turbines are certified safe for birds.

When can I have it on my site?

First projects in 2028: site studies, pilot agreements and first deliveries.

What about birds and noise?

WindNext rows are fixed and visible, certified safe for birds and produce no infrasound: there is no tower in front of or behind the blades, and the rotors turn at 12-60 RPM. Pilots include bird and infrasound monitoring.

Aren't low rotors a risk for birds?

Regulators worry about open blade tips sweeping close to the ground, where birds such as harriers hunt. WindNext is different: each rotor turns inside a fixed shroud and frame that birds see as a solid obstacle, the rows never move or yaw, and the rotors turn at only 12 to 60 RPM. Certified safe for birds. Every site still gets its own wildlife assessment, and our pilots include bird monitoring with published results.

How hard is it to install on a hill?

Modules are assembled on site from small components. The biggest segment is 1.5 × 11.3 × 2.2 m and weighs 2.3 tonnes, so smaller trucks and cranes do the job on existing access roads.

What about extreme weather and icing?

WindNext is designed to withstand winds over 300 km/h. Icing on crests is part of the pilot measurement plan.

Who maintains it?

Maintenance by WindNext with local service partners. Service is designed for a 60-year asset.

Contact

Check your site.

Tell us about your hill wind farm. We reply within 5 working days with a first view on whether WindNext fits.

I'm interested in
* Required

By sending, you confirm you have read our privacy policy.

We use the details in this form only to answer your request and prepare your site check. We do not sell your data or add you to a newsletter. Our form service, Formspree (USA), delivers the form to us. You can ask us at any time to see, correct or delete your data: info@windnext.energy. Details in our privacy policy.